Peak Energy says it will deploy the first sodium-ion battery in the Midcontinent Independent System Operator (MISO) service area with RWE Americas in eastern Wisconsin, using passively cooled grid-scale storage that cuts auxiliary power use by 90% and lowers lifetime storage costs by $70/kWh.


Image: Peak Energy

From ESS News

The Midcontinent Independent System Operator (MISO) will receive its first sodium-ion battery thanks to a dual pilot project from battery company Peak Energy and global energy company RWE Americas. The project comes a mere eight months after Peak Energy deployed the largest grid-scale sodium-ion storage system in the United States.

Set to be deployed in Eastern Wisconsin, Peak Energy’s passively cooled, grid-scale energy storage system could be the first ripple indicating MISO’s pivot toward next-gen, non-lithium storage as the grid operator faces capacity constraints, rising costs and solar project cancellations that some industry experts suspect could slow battery deployment.

To continue, please visit our ESS News website 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content