Testing fault at 100 MW battery disrupts Estonia-Finland power link
During testing at Estonia’s 100 MW Kiisa battery park, both EstLink 1 and EstLink 2 tripped, triggering the most severe disturbance to the regional power grid since desynchronization from the Russian electricity system. As a result, nearly 1 GW of capacity was lost within seconds. The park’s owner has since publicly pointed to the battery manufacturer. January 29, 2026 Marija Maisch Image: NIB From ESS News A disturbance in Estonia’s power system on Jan. 20 forced both EstLink interconnect...





