Brazil approves first co-located solar and battery project
Brazil’s National Electric Energy Agency (Aneel) has authorized a 5 MWh battery system co-located with a solar plant, setting a regulatory precedent for integrated storage. April 8, 2026 Lívia Neves Image: Statkraft From ESS News Brazil’s Aneel has granted the country’s first authorization for a co-located battery energy storage system (BESS) linked to a solar generation facility, marking a regulatory milestone for the domestic storage market. The system is connected to the Sol de Brotas...




